Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • BUILD25 Videos
    • Podcasts
    • Take our Quiz!
    • Infographics
    • SMA Home Inspector Videos
    • Image Galleries
  • EXCLUSIVE
    • Top 50 Contractors
    • Leadership Award
    • W&C Store
    • Market Research
    • eNewsletters
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
    • Classifieds
    • State of the Industry
    • Industry Links
  • BLUE BOOK
    • Blue Book Online
    • Blue Book Articles
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
InteriorTechnology

Change Orders for Contractors: Good or Bad?

A guide to help you document and perform your work, so that you're protected on every jobsite.

By Don Allen
Change Orders for Contractors
Change Orders for Contractors
specialty engineer
contractors
contractors
Change Orders for Contractors
Change Orders for Contractors
specialty engineer
contractors
contractors
September 3, 2019

Construction projects have been described as organized chaos. Architects and engineers, who admittedly do not know everything about the complex systems they are designing, work with both traditional and new materials to develop a design that mostly meets the requirements of the owner. Invariably, during the course of a construction project, discrepancies are discovered, preferences change, or conditions are found that are not accounted for in the initial design. Any of these may lead to change. If this change leads to a change in the scope of work for the general contractor or subcontractor, or it has a significant impact on the timeframe of construction, change orders will be required.

In all the standard contract forms from American Institute of Architects and in many of the contract forms from ConsensusDocs as endorsed by the Associated General Contractors of America, there are specific references to scope changes and change orders. And because most conditions have been experienced before, and there has been litigation on many of these, contractors and designers can anticipate the form of most of these changes.

 

Change Order Causes

First, let’s break this down into the most common causes of change orders:

  • Drawing errors and omissions, including conflicting details and missing information
  • Design changes. This can be even more of an issue in design-build projects, where the design phase continues during construction
  • Unforeseen or hidden conditions, such as differing subsurface soil conditions, or hazardous or historic materials found when renovating an existing structure
  • Substitutions
  • Changes in cost or availability of materials from when the contract is signed to when the construction is scheduled to begin
  • Request by owner for upgrades or moving/rearranging portions of the project

Based on these causes, a change in construction may or may not affect the cost and time it takes for a wall and ceiling contractor to perform his or her work. But it usually does. All parties that have been involved in construction for any length of time have experienced “scope creep,” where you are continuously asked to do a little bit more than what was in your original scope of work in the contract. It can start out relatively benign: the concrete is not square, so you have to add some additional shims or braces or fasteners to make sure the wall can be properly connected and plumb even though the adjacent concrete is not. At some point, if the concrete is off by enough, this involves extra costs and time, and as a contractor, you may want reimbursement for this.

Because this has happened before, general contractors usually include a couple of catch-all phrases in the contract. The first catch-all phrase is the pre-construction meeting, where the framing contractor meets with other parties before they start the work, observes the area where their work will be, and “accepts” the existing conditions as ready for the subcontractor’s portion of the work. The second catch-all phrase is a statement that when the subcontractor starts the job, they are automatically accepting what is in place. There are several problems with this.

Quite often, all of the substrates (concrete, structural steel, etc.) are not complete when the contractor starts, and sometimes these materials are in locations that cannot be verified without special equipment. It is only after the subcontractor’s work has commenced that he or she will discover how far out-of-plumb the masonry is, that was 50 feet in the air and not accessible/verifiable until more of the structure was built.

 

Protecting Yourself

So, as a subcontractor, how do you protect yourself? Here are some key points:

  • Review your contract and specifications carefully before starting.
  • If a specialty engineer or additional subcontractors are required as a part of your scope, get them on board early and engage them in the document review process.
  • Keep open, constant communication with other members of the design and construction team.
  • Document, document, document! I have heard Pat Boyd often repeat a quote from his father, who built and ran a successful drywall business for many years: “if you treat every project like it’s going to the courthouse, it probably won’t.” The key is to make sure and capture in written and electronic form any and all agreements, requests, completed work, uncompleted work, in short, everything that could affect the scope, quality and timeframe of completion of the work. You do this so that if there are questions later, you can quickly and easily pull up records of what was done when and by whom, and what was requested—when and what actions were done as a result of that request. The key is not only to document but to have a filing system so that everyone on your team can appropriately document and file information for easy indexing and retrieval. It doesn’t help to have 2000 pictures of the jobsite if you don’t know when or where they were taken.
  • Know and follow your contract. Quite often, there are requirements in other sections of the specification that affect what you can and cannot do. Construction Specifications Institute MasterFormat section 00 63 00 is entitled, “Clarification and Modification forms.” This section is typically included by reference as part of your contract and includes RFI forms, substitution request forms, Construction Change Directive forms, and Change Order forms. Section 01 26 00, “Contract Modification Procedures,” gives basic requirements for changes in the work, and section 00 90 00 includes instructions on recording revisions, clarifications, and modifications. Make sure a person that understands the legal nuances of construction contracts reads and understands these sections of the specification before signing any contract.
  • Keep records of the work you do, even if you are not charging for that work, and make sure the general contractor and others are aware of the work you are doing. For example, if on every floor of a 20-story building, at the bathrooms you have to make repairs because the plumber is notching your studs or because the owner has moved a wall, you may be willing to absorb the cost on one or two floors, but it starts to add up pretty fast. So, let the GC know that this is an issue, that you have already incurred say six man-hours of work and $150 worth of materials to make these fixes, and if it continues on subsequent floors, there will be change orders and back charges.
  • Approval is an essential part of getting paid for changes in the work. Sometimes, a general contractor will include language, prohibiting their own foremen from signing off on change orders. Even if this is the case, it’s better to get some sort of signed documentation of the requested work than having no documentation at all.

In addition to these critical points, it’s important to remember that there are three types of costs associated with changes. It’s easiest to get paid for the first of these—direct costs—but the last two are a bit more difficult.

  • Direct costs (labor, materials, supervision … hard costs)
  • Indirect costs (office overhead, delays, opportunity costs, lost profit … soft costs)
  • Consequential costs (damages, interference, disruption, re-sequencing)

In summary, the important bottom line is to be able to complete your work in a timely manner and to get paid a reasonable amount for the work you do and the expenses you incur. Below is a list of helpful resources for identifying the types of changes. Use this as a guide to help you document and perform your work so you can get paid, avoid litigation or arbitration, and move on to the next job. W&C

 

References

  • AIA Contract Documents Contract Relationship Diagrams. American Institute of Architects (AIA). April 2017
  • AISI S202-15: Code of Standard Practice for Cold-Formed Steel Structural Framing. American Iron and Steel Institute., Washington, DC. 2015
  • Brennan, Daniel et. al. The Construction Contracts Book: How to Find Common Ground in Negotiating Design and Construction Contract Clauses, 2nd Edition. American Bar Association, Chicago, Illinois. 2008
  • Bruhn, John R., The Impact of Building Information Modeling (BIM) on Change Orders for University Construction Projects. Master’s Thesis, University of Alabama. Tuscaloosa, Alabama. 2014
  • Civitello, Andrew M., and William D. Locher. Contractor’s Guide to Change Orders, 2nd Edition. BNI Building News, Los Angeles, California. 2002
  • O’Brien, James Jerome. Construction Change Orders: Impact, Avoidance, Documentation. McGraw Hill, New York. 1998
KEYWORDS: business management engineering general contractors

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Wc0319 ft3 design p4 author donallen

Don Allen, P.E., LEED A.P. is an internationally known expert in cold-formed steel design, and currently serves as director of Don Allen is executive director of the Steel Framing Industry Association (SFIA).

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Walls & Ceilings Top 50

    W&C Top 50 Contractors

    Ceilings
  • the Walls & Ceilings State of the Industry Study

    W&C State of the Industry

    The wall and ceiling industry seems to be holding...
    State of the Industry
    By: John Wyatt
  • Non-Structural Cold-Formed Steel EQ Member

    What is an “EQ” Stud?

    How do you differentiate between EQ studs?
    Steel Framing
    By: Fernando Sesma
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • eNewsletter
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Architectural Photgraphy
    Sponsored byUSG

    Evolution in Construction: USG Drywall and Suspension Systems

  • FireLITE Type X Lightweight Drywall
    Sponsored byCertainTeed

    Balancing Fire Resistance and Sustainability in Building Design

  • HITT contracting headquarters
    Sponsored byBuilding Composites LLC

    The Rise of Structural Composites

Popular Stories

Walls and Ceilings presents our annual Top 50 list of Wall & Ceiling Contractors in the country

2025’s Top Wall and Ceiling Pros — See Who Made the List

International Walls and Ceilings Contractors

Top International Walls and Ceilings Contractors

Exterior-view-of-Department-of-Labor-building-with-cloudy-sky

What Contractors Need to Know About Workforce Grant Requirements

TLPCA and Texas Contractors Launch Workforce Initiative

TLPCA and Texas Contractors Launch Workforce Initiative

Walls & Ceilings Contractor of the Year Award

Events

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2025 National Painting Cost Estimator

2025 National Painting Cost Estimator

See More Products

Related Articles

  • Are My Bad Weather Blues Good News For You?

    See More
  • CS stacked black text 900 x 550.jpg

    Change Order Software for Drywall Contractors

    See More
  • Up Front: Good Times, Bad Times

    See More

Related Products

See More Products
  • M:\General Shared\__AEC Store Katie Z\AEC Store\Images\Walls & Ceilings\new site\Contractors_guide-change-or.gif

    Contractor's Guide to Change Orders

  • bim 3e.jpg

    BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd Edition

  • cannabis.jpg

    Cannabis For Dummies

See More Products

Related Directories

  • International Institute for Lath & Plaster

×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • eNewsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2025. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing